Food Packaging Coding
Evaluate dates, lot data and machine-readable codes across actual films, cartons, containers or direct products.
Discuss this applicationStart with the real product, material, code and production process, then compare an honest equipment configuration and the proof required for approval.

Use these anchored application summaries as safe navigation until each evidence-complete detail page is released.
Evaluate dates, lot data and machine-readable codes across actual films, cartons, containers or direct products.
Discuss this applicationSeparate code application, verification, data handling and validation scope for the defined package and market.
Discuss this applicationReview continuous product motion, pipe material, contrast, permanence, marking pitch and line integration.
View Pipe MarkingEvaluate bottle material, colour, geometry, moisture, line handling and the available code position.
Discuss this applicationDefine material, surface finish, heat sensitivity, code size, readability and precision handling.
Discuss this applicationEvaluate metal grade, coating, mark mechanism, contrast, durability, fixture and safety integration.
Discuss this applicationThe table is an engineering starting point, not a substitute for a test or approved model datasheet.
| Application condition | Possible starting process | Proof required |
|---|---|---|
| Fine mark with controlled heat effect | UV laser marking | Material response, contrast, surface change and cycle |
| Permanent mark on suitable metals or plastics | Fiber laser marking | Material grade, finish, mark result, guarding and extraction |
| Variable non-contact code on moving products | CIJ or TIJ depending on handling | Ink, substrate, drying, print distance and line conditions |
| Variable code on flexible packaging web | TTO or packaging-specific process | Film, ribbon, print area, machine motion and timing |
| Changing data with inspection requirement | Variable data printing and optional vision | Data map, code test, inspection rule and line response |
Use only the system layers supported by the approved project scope.
Apply the approved code with controlled product handling.
Add trigger, encoder if needed, mounting and control response.
Add a documented vision rule and alarm, stop or reject action.
Add approved data exchange and records within a defined boundary.

Send the material, artwork, line conditions and acceptance requirement to DANAPR.