Eggs in rows
Match head layout and mounting to the actual tray, row spacing, egg size range and conveyor path.
Apply approved dates, lot data and text across eggs presented in rows, with the equipment configuration qualified around real eggs, trays, ink, code content and line handling.

The system is designed around eggs moving through a defined print position. It requires controlled presentation and an approved eggshell print test.
Match head layout and mounting to the actual tray, row spacing, egg size range and conveyor path.
Define approved date, lot, text or other fields, including size, orientation and update workflow.
Maintain stable egg presentation, trigger timing, access and routine cleaning around the print zone.
Natural variation in eggs and trays makes representative testing essential.

Final entries must be taken from the approved DANAPR configuration, installation drawing and eggshell print test.
| Field | Project entry | Evidence required |
|---|---|---|
| Egg and tray range | Define egg size, shell colours, surface condition and carrier formats | Representative production samples |
| Rows, lanes and printheads | Confirm for selected mechanical configuration | Approved layout and equipment datasheet |
| Code content and area | Define text, date, lot and readable size | Approved artwork and print sample |
| Throughput or cycle | Confirm under actual tray, code and line conditions | Production-representative trial |
| Ink and consumables | Confirm approved type, handling and change process | Eggshell print and drying test |
| Trigger and data workflow | Confirm job selection, update, trigger and control method | Functional test specification |
| Dimensions and utilities | Confirm for selected equipment and installation | Verified drawing and installation document |
| Cleaning and environment | Define cleaning process, access and site conditions | Approved operating scope |
Acceptance should cover more than a single ideal egg.
Include expected shell colours, sizes, surfaces and carrier formats.
Assess contrast, drying, adhesion, readability and position.
Run normal product variation at the agreed handling conditions.
Document the approved ink, code, configuration and operating window.
These images document the equipment format and printed eggs available in the current project asset set.



Share the sample range, code, line motion and acceptance criteria with DANAPR.